When you’re investing thousands of dollars in a structure for your property, shouldn’t it be built to last? While others cut corners with cheap materials and shortcuts, we build every structure with the same quality and attention to detail you’d expect in a custom home.
The difference isn’t just in how it looks when we’re done – it’s in how it performs 10, 20, even 30 years from now.
While others slap together prefab pieces and hope for the best, we build every structure stick-by-stick on your property. This isn’t just a different method – it’s a superior method that creates structures built to last generations.
✅ 16″ On-Center Wall Framing – Maximum strength and stability in every wall
✅ Double Studs Every 4 Feet – Dedicated support so every piece of siding is nailed into its own stud
✅ 50-Year LP Smart Siding – Premium engineered composite that won’t rot, warp, or split
✅ Radiant Barrier Roof Decking – Keeps your structure cooler in summer heat
✅ 30-Year Architectural Shingles – Not cheap 3-tab shingles that curl and fail
✅ Hurricane Clips Throughout – Steel connectors at every joint for maximum wind resistance
✅ Wrapped in Tyvek House Wrap – Complete moisture barrier protection
✅ 3/4″ Tongue & Groove Flooring – Real flooring with 50-year warranty, not OSB
✅ Double Trim on Windows – Professional finished appearance inside and out
✅ Load-Bearing Gable End Porches – Strong enough for extra storage or sleeping areas
💰 16″ OC Framing – Competitors charge $500+ for what we include standard
💰 Hurricane Clips – $300+ upgrade fee at most companies
💰 Quality Siding – $800+ to upgrade from vinyl to LP Smart Siding
💰 Radiant Barrier – $200+ upgrade most places
💰 Architectural Shingles – $400+ to upgrade from basic 3-tab
💰 Tyvek House Wrap – $150+ upgrade fee elsewhere
💰 Real Wood Flooring – $600+ to upgrade from OSB that voids warranty if covered
💰 Professional Window Trim – $200+ for double trim work
💰 On-Site Building – Other companies charge 15% extra to build on-site instead of prefab
The Bottom Line: You save over $3,000 in “upgrade” fees because we include what should be standard in every quality structure.
| All rights reserved | Privacy Policy | Terms and Conditions